Skip Navigation

Gallery

SRR: Sample-Return Rovers as Work Crew

06/07/2006
SRR: Sample-Return Rovers as Work Crew
SRR and SRR2K acting as the Robot Work Crew, transporting an extended beam (2.5 meters long) in the Arroyo Seco next to JPL. The terrain is sandy soil with an average slope of 9-degrees.